Search This Supplers Products:bimetal thermometerboiler gaugeremote reading thermometerdigital thermometerpressure gaugeglass thermometer
time2017/12/26
1. Ensure that the normal production will not be affected, it must be permitted before dismantling the thermometer.
2. It must be confirmed that the surrounding environment is safe, and dismantling with a riot wrench. (Note: the thermometer connector which connects the pipe must be fixed with a wrench to avoid loosening)
3. The instrument interface on the pipe must be sealed by the clean cloth or other items to avoid the debris fall into the pipe.
4. The tube section of replace the thermometer needs to be emptied.
5. Remove the bimetal thermometer from the old thermowell, and install the new thermowell.
6. Fill the pipe slowly and checkthe leaking at any time.
7. Fill a few of conduction oil into the thermowell.
8. Install the thermometer, please note do not hold the case of the bi-metal thermometer.
9. Observe whether the thermometer works well or not.
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2025 Tradevv.com. All rights reserved.